:::

Defense News

print

Air Force HQ said (27th) that after the assessment on sea condition, the contractor “Dragon Prince Hydro-Survey Enterprise Co.”, to search the lost mirage had despatched its dredge at 1450 with Air Force’s experienced personnel to operate at the designated location.

Air Force HQ indicated that the case had two stages, “Search and locate” and “Dredge up”. During the operation Navy and Coast Guard Agency would deploy vessels to secure the perimeter.